Petroleum, Chemicals and Petrochemicals Investment Region, Government of Gujarat
Rail Connectivity
rail-connectivity

Existing

  • Connected to Delhi – Mumbai Broad Gauge railway line at Bharuch

Proposed

  • Bharuch-Dahej rail line (62 km) – Conversion to broad gauge to be completed by June 2011
  • Delhi-Mumbai Dedicated Freight Corridor (DFC) will touch the PCPIR on the eastern side
  • Bharuch-Dahej broad gauge linne to be connected to the DFC at Dayadra Jn.